Upcoming reverse auctions

 

  item name event date
Renovation of Community Centre 19 Jul 2019
3 day(s) left
PC (S) RATE CONTRACT FOR PERIOD OF 2018-21-MEDIUM-INDUSTRIES. 18 Jul 2019
2 day(s) left
Refractory installation in HTML, reheating furnaces, LDCP, RH degasser and other miscellaneous jobs. 17 Jul 2019
1 day(s) left
INSTRUMENTATION JOBS OF BF-5 CAPITAL REPAIR 17 Jul 2019
1 day(s) left
PP Lined C.I.Weir Type Diaphragm Valves. 17 Jul 2019
1 day(s) left
  item name event date
FIRE EXTINGUISHERS 17 Jul 2019
1 day(s) left
Checker, Fire Clay, MRK:HOBS-101 17 Jul 2019
1 day(s) left
REDUCTION IN POLLUTION FROM OVEN TOP EQUIPMENT IN WORKING CO BATTERIES 17 Jul 2019
1 day(s) left
ASSISTANCE OF INSTRUMENT MAINTENANCE ACTIVITY IN DIFFERENT SECTIONS OF INSTRUMENTATION DEPARTMENT 17 Jul 2019
1 day(s) left
Assistance in Operational Activity of CPP Boiler 6, 7 and 8 for equipments installed at zero meters. 17 Jul 2019
1 day(s) left
Maintenance of record room, carrying out miscellaneous jobs, record keeping and assisting in dispatch jobs in Contract Cell 17 Jul 2019
1 day(s) left
Maintenance and structural repair jobs in WRM and BM reheating furnaces 17 Jul 2019
1 day(s) left
Mag Chrome Bricks 17 Jul 2019
1 day(s) left
Addition of Shots and Chemicals 17 Jul 2019
1 day(s) left
Transportation of Aluminium from M/s. NALCO, Angul to BSP, Bhilai on Door Delivery basis 16 Jul 2019
0 day(s) left
GRINDING MACHINE,HIGH FREQ 16 Jul 2019
0 day(s) left
SPIRAL BRUSH 16 Jul 2019
0 day(s) left
OPERATIONAL ASSISTANCE OF STOCK HOUSE BF 1 TO 7. 16 Jul 2019
0 day(s) left
Repair/replacement and maintenance of sanitary and Water Supply installations inside Plant Area. 16 Jul 2019
0 day(s) left
Repair and Maintenance Jobs for Sinter M/c building area of Second Sinter Machine of SP-III 16 Jul 2019
0 day(s) left
ASSISTANCE IN MISCELLANEOUS OPERATION JOBS IN BOILER HOUSE OF PBS-1 16 Jul 2019
0 day(s) left
VARIOUS ROUTINE MAINTENANCE JOBS IN MILL AREA OF BILLET MILL,BBM 16 Jul 2019
0 day(s) left
SAMPLING PROBE 16 Jul 2019
0 day(s) left
LOADING OF MATERIAL IN FAFA 16 Jul 2019
0 day(s) left
30 MVA OFW FURNACE TRANSFORMER FOR LHF -2C OF SMS-II 16 Jul 2019
0 day(s) left
STAINLESS STEEL GATE VALVE 16 Jul 2019
0 day(s) left
Ladle Slide Gate machine 16 Jul 2019
0 day(s) left
WHEEL,CUP,DIA:110/90MM,BORE:22.23 16 Jul 2019
0 day(s) left
HOUSEKEEPING IN CHP AND FOS AREA. 16 Jul 2019
0 day(s) left
RFQ NO :19-20/579, DT: 10.07.2019 FOR 30.00 MT OF PLATE 28 MM THK E350 BR ONLINE NORMALIZED UT PLATE SECTIONS FOR TATA GROWTH SHOP (TGS)_JAMSHEDPUR. 16 Jul 2019
0 day(s) left
Band Section 16 Jul 2019
0 day(s) left
LED Flood light fixtures 16 Jul 2019
0 day(s) left
CUTTING AND STACKING OF IT GUNNY BAGS AT PS-II 16 Jul 2019
0 day(s) left
RFQ No :19-20/576 , Dt: 09.07.2019 for 145.870 MT of Various size of ASTM A516 GR. 70 plate Sections for TSK Project( Kalinganagar) Dubri, Jajpur. 16 Jul 2019
0 day(s) left

Open tenders

New User Manual | Existing User Manual

RFQ client / tender starts on ends on
DGM/CCW/EP2019300178/BF/OT/2019/2576_13.06.19 Shifting and stacking of the granulated slag from slag yard_BSP-CCW_Bidding basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 15 Jun 2019
In Progress
16 Jul 2019
DGM/CCW/EP2019300140/URM/OT/2019/2584_14.06.19 Roll shop management of URM BSP_BSP-CCW_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 15 Jun 2019
In Progress
16 Jul 2019
DGM/CCW/EPNO2019300206/BRM/OT/2019/2918_21/06/19 Annual Maintenance Contract of WTP-5, WTP-6, WTP-7 of BRM_BSP-CCW_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 24 Jun 2019
In Progress
16 Jul 2019
DGM/CC-W/EPNO2019300231/RED1/OT/2019/2897_21/06/19 Sorting, loading, transporting and unloading of used/fresh refr. Bricks,castables,muck and collection and transportation_Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 24 Jun 2019
In Progress
16 Jul 2019
DGM/CCW/EP2019300240/CED/LTR/2019/3264_28.6.19 Renovation/Facelifting job in Despatcher building of Plate Mill & Repair of floor at Laddle Bay near Laddle repair pit_Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 29 Jun 2019
In Progress
16 Jul 2019
DGM/CC-W/EPNO2019300236/INCOS/OT/2019/3278_28/6/19 Maintenance of the Process Network and its components installed at various MODEX locations of Bhilai Steel Plant_Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 03 Jul 2019
In Progress
16 Jul 2019
DGM/CC-W/2019300196/CO&CCD/LTR/2019/3302_29/6/19 MECHANICAL MAINTENANCE JOBS IN DPTS & BATTERY MACHINES OF COB-11 COMPLEX_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 03 Jul 2019
In Progress
16 Jul 2019
DGM/CC-W/EPNO2019300281/BBM/LTR/2019/3343_01/7/19 Repair Of Soaking Pit Structure & Equipments In Bbm,Bsp_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 03 Jul 2019
In Progress
16 Jul 2019
DGM/CCW/EPNO2019300160/BFs/LTR/2019/2976_22/06/19 Operational Assistant - SGP Work of BF # 8 (INBA-1 &2 AND GSTS)_BSP-CCW_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 24 Jun 2019
In Progress
18 Jul 2019
DGM/CC-W/EP NO.2019300277/T&D/OT/2019/3445_03/7/19 REPAIR OF RAILWAY TRACKS IN EMERGENCY_BSP-CCW_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 05 Jul 2019
In Progress
18 Jul 2019
DGM/CCW/EPNO2019300253/CO&CCD/LTR/2019/3385_2/7/19 Various mechanical repair and maintenace jobs in COB # 1 to 11 excluding Battery No 2 and 7_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 05 Jul 2019
In Progress
18 Jul 2019
SAIL/BSPCPA/FeVanadium/Jan-Jun19/1819/002/_27/6/19 FERRO VANADIUM_Overseas Suppliers USD/EURO per MT on FOB&CFR Chennai/Kolkata/Mumbai Sea port basis (OR) Domestic Suppliers - LCNITCG basis in INR per MT on FOR respective destination plant 08 Jul 2019
In Progress
18 Jul 2019
19R05715057/2019100091 dtd. 29.06.2019 Shot Crete Material for Supply&Application for Blast Furnace#1,6&7_Material: Overseas-Per SET CFR Vizag Seaport Visakhapatnam/Indigenous : Per SET FOR BSP Stores price(Application-Per Activity in INR) 10 Jul 2019
In Progress
18 Jul 2019
DGM/CCW/EP2019300265/RMP-3/LTR/2019/3566_05.07.19 Assistance in operational activity at LDCP in RMP-3 in all shifts round the clock as per directive of COA_Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 11 Jul 2019
In Progress
18 Jul 2019
DGM/CCW/EP2019300225/LTR/EMD/2019/3614_05.07.19 Assistance for operation of Liquid Fuel Station (G) of EMD_BSP-CCW_Bidding basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 15 Jul 2019
In Progress
18 Jul 2019
SAIL-ISP/RM/PUR/CPA/SMS GRADEDOLO-2/19-20 19.06.19 SMS Grade Dolomite (by Rail)_Size 25 - 60mm_Plant - ISP, Burnpur, BSP, Bhilai, BSL, Bokaro & RSP, Rourkela_Bidding Basis - Rs rate Per MT. LCNITC 01 Jul 2019
In Progress
18 Jul 2019
SAIL/CMO/T&S/BTSO VIZAG/19-20/IMP/3 Undertaking Stock verification of Imported Coking Coal / Non-Coking Coal, Metallurgical Coke and Limestone at Visakhapatnam / Gangavaram Port_Rate per Tonne (Excluding GST and Cess if applicable) 25 Jun 2019
In Progress
19 Jul 2019
RD/MM-FR&T (APP-02)/35079 Dated: 19/06/2019 Manufacturing and supply of shell of smooth roll primary coke crusher of RMHP_ LCNITC basis for complete lot(Two numbers) at our(DSP,SAIL)site considering all the items/service(total quantity)as perTS 08 Jul 2019
In Progress
19 Jul 2019
SAIL/CPG/SLCC/OT/19-20/01 Dated : 01/07/2019 Supply, installation and commissioning of VSAT based communication system for SLCC system of SAIL_Bidding Basis-Total Landed Cost for the full Lot, net of input Tax credit basis 11 Jul 2019
In Progress
21 Jul 2019
ASP/CAC/19/6470/0558 DATE:03/07/2019 Conversion of SPM III work roll of BSL_SAIL-ASP_Bidding Basis-Conversion rate per pc plus freight value per pc of input material from asp to vendor's work excluding all taxes & duties 09 Jul 2019
In Progress
23 Jul 2019
DGM/CCW/EP2019300288/T&D/OT/2019/3600_05.07.19 Capital repair of iron zone tracks, bunker tracks & rebuilding of box type buffers & deweeding in & around railway track_Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 08 Jul 2019
In Progress
23 Jul 2019
DGM/CCW/EP2019300303/F&SS/LTR/2019/4024_13.07.19 Technological Assistance in Repair & Maintenance of Equipment's in Steel Structural Shop_BSP-CCW_Bidding basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 15 Jul 2019
In Progress
23 Jul 2019
SAIL/CMO/T&S/BTSOVIZAG/19-20/YARD/02 DT.15.07.2019 Repair of Boundary Wall & Entrance Gates at M/s SAIL,BTSO,Export Yard,Visakhapatnam_Quote in (%)Percentage (+)ABOVE/(-)BELOW/(0)AT PAR with respect to total Estimated Cost Rs.429510.00/-excluding GST 15 Jul 2019
In Progress
23 Jul 2019
DGM CCW/Civil Engg Dept/2019300275/LTR_27/6/19 Miscellaneous civil repair jobs in Zone-3&4areas of CED_BSP-CCW_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 11 Jul 2019
In Progress
25 Jul 2019
DGM/CCW/EPNO2019300287/RMP1/LTR/2019/3836_11/7/19 Assistance in mortar & masses preparation and Assistance in cleaning & operational activities_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 15 Jul 2019
In Progress
25 Jul 2019
DGM/CCW/EPNO2019300315/BBM/LTR/2019/3936_12/7/19 Supply of Material Handling equipment for Blooming & Billet Mill_BSP-CCW_Bidding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 15 Jul 2019
In Progress
25 Jul 2019
BPSCL/P&C/19-20/C-011/NIT-804/1980 Date:03/06/2019 Installation of Microprocessor based Fire Detection & Alarm System on Turnkey Basis_SAIL-BPSCL_Bidding Basis-Landed Cost excluding GST Basis 04 Jun 2019
In Progress
26 Jul 2019
BPSCL/P&C/18-19/C-174/NIT-812/1946 Date:30/05/2019 Manufacturing of Fly Ash Brick in BPSCL Plant Premises_SAIL-BPSCL_Bidding Basis-Quote in(%)Percentage(+)ABOVE/(-)BELOW/(0)AT PAR with respect to total Estimated Cost Rs. 1769372.00/-Excluding GST 04 Jun 2019
In Progress
26 Jul 2019
BPSCL/P&C/19-20/C-047/NIT-816/2165 Date:26/06/2019 Assistance for Preparation & Transferring Chemical Solutions in WCTP (TPP&CPP)_Quote in (%)Percentage (+)ABOVE/(-)BELOW/(0)AT PAR with respect to total Estimated Cost Rs.2486745.00/- excluding GST 28 Jun 2019
In Progress
26 Jul 2019
BPSCL/P&C/19-20/C-054/NIT-817/2166_Dt: 26/06/2019 De-Scaling and intermittent re-tubing of Condenser Tubes of TPP & CPP_Quote in (%) Percentage (+) ABOVE/ (-) BELOW/ (0) AT PAR with respect to total Estimated Cost Rs. 1046325.00/- excluding GST 28 Jun 2019
In Progress
27 Jul 2019
19R05715045/2019100071 dtd. 14.06.2019 Graphite Block & Carbon Block and Cold Carbon Ramming Mass for BF-7_Bidding Basis-Overseas: Per Unit CFR Vizag Seaport Price in foreign currency or Indigenous: Per Unit FOR BSP Stores Price in INR 12 Jul 2019
In Progress
27 Jul 2019
BPSCL/P&C/19-20/PUR-050/NIT-811/2167 Date:26.06.19 Supply, Installation, Testing and Commissioning of Audio Visual Alarm System for Rail Road crossover_SAIL-BPSCL_Bidding basis-Rs. For complete job on LC basis excluding GST 28 Jun 2019
In Progress
30 Jul 2019
19R04715002/2019100011 dtd. 09.04.2019 1000 MT High Alumina Refractory Cement_Code - 71510200080194_CEMENT,REFRACTORY,HIGH ALUMINA (CAL-AL-75)_Bidding Basis-Overseas: Unit CFR Vizag Seaport Price (OR) Indigenous: Unit FOR BSP Price in INR 30 Apr 2019
In Progress
30 Jul 2019
DGM/CC-W/EPNO2019300264 /RTS/OT/2019/3704_08/07/19 HANDLING OF ROLLS, CHIPS, REMOVAL FROM MACHINE PITS,LOADING ON WAGONS AND ASSEMBLING_Biding Basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 10 Jul 2019
In Progress
30 Jul 2019
DGM/CCW/EP2019300278/BBM/OT/2019/3709_08.07.19 Loading of Cinder ash / broken refractories, boulders etc. from Coke Breeze Cellar (CBC)-1 and 2 to tippers & transporting_Total LOT Value(in Rs.)inclusive of all taxes,duties,levies & Cess except GST 11 Jul 2019
In Progress
30 Jul 2019
DGM/CCW/EP2019300269/SMS-3/OT/2019/3856_11.07.19 Round the clock technological assistance for Operation of Billet Caster (CK-2) at SMS-3 of BSP_BSP-CCW_Bidding basis-Total LOT Value(in Rs.)inclusive of all taxes,duties,levies and Cess except GST 11 Jul 2019
In Progress
01 Aug 2019
BPSCL/P&C/19-20/C-038/NIT-814/2421 Date:02/07/2019 Maintenance of BF & CO Gas Line along with their equipment of TPP & CPP Boilers_Quote in (%) Percentage (+)ABOVE/ (-)BELOW/ (0)AT PAR with respect to total Estimated Cost Rs.1589900.00/- excluding GST 02 Jul 2019
In Progress
02 Aug 2019
BPSCL/P&C/19-20/C-061/NIT-818/2208 Date:29/06/2019 Construction of Washroom at 8 Meter Level and near Turbine hall entrance_Quote in (%) Percentage (+)ABOVE/ (-)BELOW/ (0)AT PAR with respect to total Estimated Cost Rs. 2729068.00/- excluding GST 04 Jul 2019
In Progress
02 Aug 2019
2019-07-16 00:12:42.256651--2019-07-16 00:12:42.281030